Eggs, milk and power directly from the neighbor

Local energy markets: a new concept for the energy transition and for strengthening the distribution network operator

European Utility Week 2019 – Paris

At the stand of the Smart Service World II at the European Utility Week in Paris, the consortium presented the project pebbles.

Wallbox at the energy campus

During a demonstration the new wallbox "VersiCharge IEC" at the control center was put into operation.

Visit of the BFZ delegation from Pakistan

On September 19th, a group of government representatives and energy suppliers from South Asia visited us.

Energy management in buildings is a central actor

At first it was the washing machine. Meanwhile the flexibility potential of electricity demand is seen in the automatic control of the charging of electric cars, heat pumps and electricity storage systems.

Delivery of campus storage

Our energy campus continues to grow and now consists of a total of four batteries.

Reopening Energy Campus Wildpoldsried

The new energy campus was reopened on June 26, 2019.

First version of the decentralized transaction platform of pebbles completed

Siemens has implemented a first version of the decentralized transaction platform based on the open source framework Coaty (https://coaty.io). Based on this test system, the individual system participants and the blockchain components are gradually being integrated.

Visit of the chilean delegation

A delegation trip on the topic “Energy Transition in Germany”, organized by the German-Chilean Chamber of Industry and Commerce together with the Chilean transmission system operator “Coordinador Eléctrico Nacional” (CEN), also led to Wildpoldsried on 17 May.

Australia visiting

On April 4, 2019, an Australian delegation visited our project and the Energy Campus Wildpoldsried.